EnoPower

Built for business continuity

Plan to keep working.
Not just to shut down.

Backup is a design choice. Drag the divider to see which work keeps going in each example.

  • Appointments and working hoursDelayed service, idle staff and work that may not be recovered.
  • Payments, records and stockDisconnected systems or temperature-sensitive inventory needing attention.
  • Restart and recoveryReopening the doors can take longer than restoring the power.

We start with what must continue, then review protected loads, reserve, runtime and transfer. Continuity is the design goal, not a universal no-interruption guarantee.

Plan your backup priorities ›

One system. Three questions worth asking.

Explore your business case ›

Applications

Clinics first.
Built around your work.

Start with dental, medical, veterinary and pharmacy needs. Explore the same planning approach for other businesses.

Explore applications ›

How it works

Stored energy,
through the day.

Choose a mode. Follow the direction of power, with your backup reserve still in mind.

Understand daily use and backup ›

Monitor and control

Monitor. Control.
Plan ahead.

Energy and compatible lighting, presented in one clear interface. Explore the direction, not a live system.

Current and planned capabilities ›

Your backup priorities

What would you want protected?

Choose your site type, tap a few essentials and pick how long they should run.

Your site

Equipment to keep running

{{ g.title }}

How long should it run?

{{ needsDurDesc }}

From first question to a commissioned system

We ask for technical details only when they matter.

  1. 01

    Share requirements

    Use the planner or send a quick request. No electrical knowledge needed.

  2. 02

    Assess the site

    We confirm the electrical service, installation location and equipment, by documents or a visit.

  3. 03

    Review the proposal

    Configuration, what stays on, transfer arrangement, scope and pricing, with assumptions listed.

  4. 04

    Install and commission

    A licensed electrical contractor installs under permit. Tests, settings and documents are recorded at handover.

Before you ask for a quote

{{ f.a }}

All questions ›

Continuity first. Value you can examine.

Start with the work.
Then build the business case.

Explore an outage scenario, daily energy charges or an evidence-based carbon assessment. Use only the tools relevant to your project.

Optional scenarios, not a price quote, savings promise or engineering design. No account needed.

{{ doc.eyebrow }}

{{ doc.title }}

{{ doc.status }}

{{ doc.lede }}

{{ docFig.title }}

{{ docFig.sub }}

  • {{ c.status }} {{ c.t }} {{ c.a }}{{ c.b }}
{{ docFig.foot }}

{{ s.h }}

{{ para }}

  • {{ b }}

404

Page not found

The page may have moved.

Solutions

Battery storage for daily use and backup

A commissioned charge schedule for normal days, a transfer arrangement and protected loads for outages, integrated for your site. Solar optional.

Protected loads
Selected circuits, up to the whole building where the site allows
Split or three-phase
120/240 V and 120/208 V, qualified per site
Scheduled charging
Commissioned charge and discharge schedule with a reserve
Licensed install
Under permit and inspection

What the system includes

One coordinated system.

Storage, power conversion, transfer and controls are specified together for your site. Each role and its equipment are confirmed in the proposal.

  • Battery storage

    Stores energy for scheduled daily use and for backup. Usable energy and the backup reserve are stated in the proposal.

  • Inverter and charger

    Converts stored energy into the power your circuits use, and charges the battery from the grid or optional solar.

  • Transfer and protection

    An automatic or manual transfer switch moves protected circuits during an outage, with protection designed for the site.

  • Controls and monitoring

    Charge schedule and reserve are set at commissioning. Remote monitoring and control are on the platform roadmap.

Coverage

Choose how much stays on

The right level depends on your equipment, your electrical service and how long you need backup.

Essential equipment

Lights, network, computers and refrigeration on selected circuits.

Most of the site

Essentials plus key equipment and some heating or cooling.

The whole building

A design objective, not a default. It needs a load, startup, phase, duration and wiring review before we confirm it.

Site fit

Why your electrical service shapes the design

Two buildings with the same equipment can need different systems. Four things we check before anything is promised.

Target configurations are 120/240 V split-phase and 120/208 V three-phase. Other services, including 347/600 V, are reviewed per site. Optional solar is sized with the storage, where the site and configuration allow.

Send service details for review ›
Voltage and phases
Single-phase and three-phase sites use different system arrangements. Three-phase applications require review of the supported system arrangement, each phase's loads and the site's electrical service.
Per-phase limits
Each phase has its own limit. Where heavy equipment sits on one phase, the review looks at that phase, not only the total.
Motor starts
Compressors, suction, pumps and HVAC draw several times their running power for a moment at startup. We collect startup data instead of guessing.
Transfer arrangement
An automatic transfer switch (ATS) can move protected loads to stored energy and back without an operator. A manual transfer switch (MTS) needs an authorized person. Your proposal states which applies and what it means for interruption.

{{ mode.label }}

{{ mode.title }}

{{ mode.line }}

What supplies the building
Grid{{ mode.gridState }}
EnoPower battery{{ mode.batState }}

Illustrative shares. Actual behaviour follows your configuration and settings.

Specifications

Planning information. Your proposal states the configuration for your site.

{{ sp.k }}{{ sp.st }}
{{ sp.v }}

Good to know

  • {{ li }}
How planner estimates work ›

Find the right configuration

Tell us about the site. We review it and prepare a proposal.

Platform

Power first. A considered path to control.

An EnoPower system is configured for each project. Monitoring, permitted-load control and compatible lighting are planned capabilities and are shown separately.

Configured for each project

  1. 01

    Stored energy

    Capacity sized for the project.

  2. 02

    Power conversion and transfer

    Arrangement confirmed per site.

  3. 03

    Selected equipment

    Agreed in your proposal.

Planned capabilities

Monitoring, permitted-load control and compatible lighting

Availability and compatibility require a documented release. Not part of current proposals.

Conceptual system relationship only. Not a wiring diagram or an upgrade guarantee.

Interface concept

Power and lighting.
One considered view.

Battery visibility, reserve settings and compatible lighting scenes belong in a coordinated experience. Explore the controls in this demonstration.

This is an interface preview, not a live dashboard or an app-release announcement. The current project files still classify monitoring and lighting integrations as planned; their release and compatibility need confirmation.

How the layers fit

Select a layer to see what it does and whether it is available today.

{{ layer.statusLabel }}

{{ layer.label }}

{{ layer.line }}

{{ layer.detail }}

On the roadmap

Not available today and not part of current proposals. Future upgrades are not included or guaranteed, and may need hardware changes.

{{ f.label }}

{{ f.statusLabel }}

{{ f.line }}

Applications

Choose your site type to see what usually stays on and what we look at more closely.

{{ app.title }}

{{ app.line }}

Common backup priorities

  • {{ x }}

Reviewed for your site

  • {{ x }}
Plan for this site

How it works

How the system runs each day, and how a project moves from first question to handover.

Two jobs, one system

Stored energy for daily use and backup

Select a state to see where power comes from. A concept view, not a wiring diagram.

{{ ex.caption }}

{{ ex.title }}

{{ ex.body }}

Grid
{{ ex.grid }}
Battery
{{ ex.bat }}
Your loads
{{ ex.loads }}

{{ ex.note }}

{{ ex.linkLabel }}

Overnight

The battery charges while electricity is priced lower.

Daytime

The grid supplies the building. The battery holds its charge and reserve.

Higher-priced hours

Stored energy supplies part of the building.

During an outage

Protected loads move onto stored energy through the transfer arrangement in your proposal. An automatic transfer switch (ATS) does this without an operator; a manual transfer switch (MTS) needs an authorized person. A reserve is kept back for this.

The reserve trade-off: energy kept for outages is energy not used on the daily schedule. Settings are agreed at commissioning and can be changed.

A typical weekday
Charging Grid Stored energy

Illustrative. Hours follow your rate plan and settings agreed at commissioning.

Your project, step by step

Who does what at each stage.

  1. {{ p.n }}

    {{ p.t }}

    {{ p.d }}

    {{ p.who }}

What affects backup time

Backup time is not a property of the battery alone. Four quantities decide it together, and your proposal states each one for your configuration.

kW

Protected load

Everything that runs at the same time, plus startup surges from motors.

kWh

Usable energy

Stored energy the system can actually deliver, after conversion losses and depth-of-discharge limits.

%

Reserve

The share held back for outages instead of being used on the daily schedule.

h

Desired hours

How long the protected load should run. Fewer loads or a larger reserve stretch the same energy further.

Roughly, the energy held in reserve divided by the protected load gives the hours. We give a figure for your site only after a technical review.

What should your backup plan cover?

Five questions worth asking of any proposal, ours included, and where EnoPower answers each one.

  1. 01

    Which equipment and circuits are included?

    Listed by name in your proposal, from the equipment you selected in the planner and the site assessment.

  2. 02

    How much can run at the same time, including motor starts?

    Stated as a continuous rating and a startup allowance, with the startup data we collected for compressors, pumps and HVAC.

  3. 03

    How long can the selected loads run at the planned reserve?

    Given as hours for the listed loads at the agreed reserve, with usable energy and losses shown, not a battery size alone.

  4. 04

    What happens during grid loss, equipment failure and restoration?

    The transfer arrangement (ATS or MTS), expected interruption, alarms and the return to grid supply are described for your configuration.

  5. 05

    What site review, installation work and commissioning evidence are included?

    Scope, exclusions, permit and inspection responsibilities, and the commissioning record you receive at handover.

What helps us prepare a proposal

Site type and location

A postal code is enough to start.

What matters most

Backup, scheduling, peak demand, and what should stay on.

Anything you already have

Bills, equipment lists or drawings. Not sure is fine.

Never open an electrical panel or remove a cover to answer our questions. We collect those details during review.

Preview build: nothing was sent

{{ pl.doneTitle }}

Your reference is {{ pl.ref }}. Use it if you contact us about this project.

  1. {{ n.n }}{{ n.t }}
{{ b.k }}
{{ b.v }}
{{ pl.json }}

Energy Planner

{{ pl.modeNote }}

{{ pl.stepOf }}About the project

A few basics so we can route your request.

Who is submitting?

{{ pl.m.role }}

Site type

{{ pl.m.app }}

Project stage (optional)
Where is the site?

{{ pl.m.postal }}

{{ pl.covTitle }}

{{ pl.covMsg }}

Can equipment be installed at the property?
Your role
What matters most?

{{ pl.stepOf }}What should the system do?

Choose everything that applies. Planned features are labelled and are not part of current proposals.

Priorities

{{ pl.m.goals }}

What should stay on during an outage?
For how long?

Your requirement, not a promised runtime.

{{ pl.m.durationCustom }}

What is backup for?
Can your equipment handle a brief interruption?

We arrange a specialist continuity assessment. This system is not a UPS or life-safety system unless a specific configuration is approved for that use.

{{ pl.stepOf }}What needs power?

Choose what needs to stay on. Add ratings if you know them; we confirm the rest in review.

Choose familiar equipment. Typical values are used until you add your own.

Backup is not selected, so this step is optional.

Selected: {{ pl.loadCount }}

Essential means it must stay on. Occasional means it runs now and then, not all day.

Essential items are what must stay on. Occasional use counts for a quarter of the time, or less.

{{ it.label }}{{ it.ratingText }}{{ it.tag }}
{{ it.qty }}

Attach your load schedule in the Site step. A specialist reviews it. No figure is calculated here.

Where do these figures come from?

Equipment you selected is kept as notes and never added to this total.

{{ pl.stepOf }}About the site

Optional. Share what you know and we confirm the rest during review.

Do you know your electrical service details?
Demand per phase (kW)
Existing equipment
Preferred installation location
When would you like the system in place?

Documents (optional)

Bills, equipment lists, load schedules, drawings or photos of existing conditions. PDF, images, CSV or Excel, up to 10 MB each.

Files upload as soon as you add them, to private storage for this request. Delete takes a file out of this request and asks our server to erase the uploaded copy. The list shows when that is confirmed.

Preview build: files stay on this device and are not uploaded.

Never open a panel or remove a cover for a photo. Do not upload patient information or payment details, and redact account numbers you do not need to share.

  • {{ fl.name }}{{ fl.meta }}
    ✓ {{ fl.doneText }} Deleting the uploaded copy… {{ fl.error }}

{{ pl.fileNote }}

{{ pl.fileNote }}

{{ pl.stepOf }}Check your answers

Edit any section. Your other answers stay as they are.

Indicative requirement

Requirements summary

{{ pl.stLabel }}
{{ t.label }}
{{ t.v }} {{ t.unit }}

{{ pl.essentialLine }}

  • {{ n }}

Draft calculation. Usable capacity, losses, inverter output, startup and phase limits are applied in technical review.

Final sizing is confirmed after a technical review.

{{ sec.title }}

{{ r.k }}
{{ r.v }}

What we will check with you

  • {{ u }}

{{ pl.stepOf }}How should we reach you?

Only what we need to follow up on this request.

{{ pl.m.name }}

{{ pl.m.company }}

Preferred contact method

{{ pl.m.email }}

{{ pl.m.phone }}

How should your client be involved?

We use your answers to prepare and follow up on this request. Do not include patient information or payment details. Privacy notice

{{ pl.failMsg }}

Preview build: sending is simulated. Nothing leaves this page.

For contractors

For electrical contractors

Submit a client project, find technical documents or register partner interest. Each one is separate.

Illustration of an electrical contractor and a business owner reviewing a floor plan together in a daylit office.
Illustration, not a specific project. You keep the client relationship.

Submit a project

Send load schedules, drawings and service details. You keep the client relationship, and client details are not needed to start.

Start a project ›

Technical documents

Checklists and templates for site readiness, electrical data, responsibilities and commissioning.

Browse documents ›

Partner interest

Reselling, referral and installation are separate relationships. Terms are discussed individually.

Register interest ›

{{ collabFig.title }}

{{ collabFig.sub }}

  • {{ c.status }} {{ c.t }} {{ c.a }}{{ c.b }}
{{ collabFig.foot }}

What helps us quote a project

  • Service voltage, phase and main breaker rating
  • A load schedule, measured demand or an equipment list
  • Single-line drawings, if available
  • Startup data for motors, compressors and pumps
  • Installation location, project reference and timeline

Missing something? Send what you have. Nothing here requires joining a program.

Partners

Register partner interest

We are recording interest in referral, specification or design, electrical installation and resale relationships. They are separate, and no program terms are published yet. To quote a project, submit it directly.

Preview build: nothing was sent

Interest registered

Reference {{ pt.ref }}. We contact you to discuss the relationships you chose. This does not create a partnership or approval.

{{ r.k }}
{{ r.v }}

Registration is not open yet

Partner interest is not being recorded on this site at the moment. Use Contact and support, or submit a project directly.

{{ pt.draftNote }}

{{ pt.m.company }}

{{ pt.m.name }}

{{ pt.m.email }}

{{ pt.m.region }}

Your business
Relationships you are interested in

{{ pt.m.rel }}

Installation details are asked only because you chose electrical installation. A person reviews them under the program rules in force. They do not grant approval.

{{ pt.m.jurisdiction }}

Review your interest

Check your answers. Nothing is sent until you choose Register partner interest.

{{ r.k }}
{{ r.v }}

{{ pt.m.consent }}

{{ pFailMsg }}

Preview build: sending is simulated. Nothing leaves this page.

Resources

Documents and answers, grouped by who they help.

Business-value explorer: continuity, energy cost and carbon impact

{{ rs.count }}

These documents are sent on request after a short check of your project. Technical documentation for a specific configuration is provided with the proposal.

  • {{ d.code }} · {{ d.kind }} · {{ d.audience }}

    {{ d.title }}

    {{ d.purpose }}

    Request ›

No documents match. Try another word, or ask us.

{{ g.g }}

{{ f.a }}

No questions match. Try another word, or ask us.

Contact and support

New projects and existing systems are handled separately, so each reaches the right person.

New project or quote ›Use the Energy Planner or send a quick request. Contractors and partners ›Project submission, documents and partner interest.
Existing system supportChoose Existing system support in the form. Support is handled apart from new quotes.
{{ r.k }}
{{ r.v }}{{ r.v }}

Phone, email and mailing address are added before this website is released.

Preview build: nothing was sent

Message received

Reference {{ ct.ref }}. {{ ct.doneMsg }}

Send a message

{{ ct.m.name }}

{{ ct.m.email }}

{{ ct.m.message }}

Do not include patient information or payment details. Privacy notice

{{ ct.note }}

{{ cFailMsg }}

Preview build: sending is simulated. Nothing leaves this page.

Ask EnoPower

Search and ask EnoPower

Ask about backup needs, energy use, controls or project documents.

Search is not available on this site yet. Use the menu, or contact the team.

{{ as.modeBadge }}{{ as.modeNote }}

Try a question

{{ mm.ctx }}

{{ mm.text }}

{{ mm.label }}

{{ mm.text }}

Go to {{ mm.direct.title }} ›
Searching approved pages…

Ask the team to follow up

{{ ho.availability }}

{{ ho.scope }}

Enter an email address like [email protected].

Confirm what is shared before sending.

Preview only. No request was sent and no ticket was created.

Live help is not connected yet. Use Contact and support and include what you need. Nothing from this conversation is sent automatically.

Preview other states

For design review only. The next question shows the chosen state instead of an example answer.

Project accounts

Project accounts are not available yet

Everything on this site works without an account. You can request a quote, submit a contractor project or contact the team directly.

Design preview. Sign-in, email and storage are not connected.

Welcome back

Sign in to your projects

Signing in never requires another trade application. Quotes and public pages stay available without an account.

{{ ac.mEmail }}

Trouble signing in?

Sign in

Check your email

If an account exists for {{ ac.email }}, a one-time sign-in link is on its way. Links work once and expire after a short time.

Preview only. No email was sent.

Sign in

This link has expired

Sign-in links work once and expire after a short time. Request a new one for {{ ac.email }}.

Create an account

A place for your project

Enter your name.

{{ ac.mEmail }}

Your role helps show the right next step. It does not grant access to any company's projects, and an email domain is never proof of access.

Create an account

Verify your email

A verification link goes to {{ ac.email }}. The account starts once the email is verified.

Preview only. No email was sent.

Signed in, preview

{{ ac.welcome }}

What would you like to do next?

Start a projectPrepare requirements, files and questions in a project workspace.

{{ ac.inviteNote }}

Register partner interestA separate application for referral, specification, installation or resale relationships.

Your account, company membership, project access and partner status are separate. Signing in does not make you an approved partner, and an email domain never grants access to a company's projects.

Project accounts

The project workspace is not available yet

Everything on this site works without an account. You can request a quote, submit a contractor project or contact the team directly.

Project workspace

Your projects, together

Prepare requirements, share documents and follow a proposal. Public pages and quote requests stay available without an account.

Sample workspace. Demo data, not an account.{{ ws.who }}Sign in ›

Projects

New projects start in the Energy Planner, so requirements use one data model. In production, the planner record is saved to this workspace as a draft.

Open the Energy Planner ›
DraftRevision 1

Example clinic project

Requirements are being prepared. No proposal has been issued.

Site
Not entered yet
Selected loads
None recorded
Backup duration
Not set
Files
None
Open questions
Service voltage and phase. Installation location.
Collaborators
You, owner
Project states
Draft
Visible to you and invited collaborators only.
Submitted
Sent to EnoPower. Later changes create a new revision.
Under review
A person is checking requirements and documents.
More information needed
Specific questions are waiting for an answer.
Proposal ready
A reviewed proposal is available to authorized members.
Archived
Read-only, kept under the retention policy.

Project documents

No private documents in this sample.

Each document shows its version, publication date, applicable configuration, approval status and access level. A replaced document carries a notice that points to its successor.

Browse public documents ›

Project messages

No messages yet.

A general Ask EnoPower conversation is never shared with a project automatically. You choose what to attach, and only invited members can read project messages.

Proposals

No proposal has been issued.

Proposals are prepared by people after technical review. Each one shows its revision, issuer and status.

Partner application

Not submitted

Your account and a partner application are separate. You can prepare your own projects while an application is reviewed, and submitting a project never requires partnership.

Register partner interest ›
Application states
  • Not submitted
  • Submitted
  • Clarification requested
  • Not approved at this time
  • Approved for a discussed relationship

{{ wsFig.title }}

{{ wsFig.sub }}

  • {{ c.status }} {{ c.t }} {{ c.a }}{{ c.b }}
{{ wsFig.foot }}
EnoPower

Battery backup planned around the work a business needs to keep doing. Ontario, starting in the Greater Toronto Area.

© 2026 EnoPower.Preview build: sample data, simulated submissions.